Corresponding author: Vladimir I. Usanov ( vouss@ippe.ru ) Academic editor: Georgy Tikhomirov
© 2018 Vladimir I. Usanov.
This is an open access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Citation:
Usanov VI (2018) Systemic competitiveness of nuclear energy sources*. Nuclear Energy and Technology 4(4): 271-277. https://doi.org/10.3897/nucet.4.31891
|
Possibilities are analyzed for improving the commercial attractiveness of nuclear electricity generation in market conditions. A model is presented in which a financially integrated electricity generating system comprising several units of one technological type, rather than a single unit, is subject to an economic analysis. Issues have been considered involved in the calculation of the electricity cost in such systems and their construction. It has been shown that the calculated unit cost of the electricity generated in a financially integrated nuclear energy system with the number of units being more than one, provided it is financed by shareholders and creditors, can be lower as compared with the cost of the electricity generated by power units, not integrated economically, of the same capacity under the same investment conditions.
The effect is achieved thanks to the short-term crediting component in the electricity cost the funds on which can be returned, at a time, for a smaller number of units (even for only one), as electricity is produced by all units in the system. The results of the calculations for nuclear energy sources and combined-cycle plants using the developed model make it possible to conclude that the switch from economic models of individual nuclear units to models of integrated energy systems can bring the calculated economic performance of nuclear power closer to (or better) the performance of fossil-fuel energy sources. If achieved, this may increase the commercial attractiveness of nuclear power and contribute to a growth in the public and private investments in nuclear power business.
Nuclear power business, competitiveness, electricity cost, capital market, funding mechanisms, computational model, financially integrated system
Competitiveness of nuclear power plants is one of the key requirements for the sustainable nuclear electricity generation. However, the existing electricity generation calculation methods show that high unit capital costs and lengthy NPP construction times in conditions of high interest rates on capital may lead to the loss of the economic competitiveness by nuclear power technologies.
Models based on comparing the cost of energy generation by single power plants are used to estimate the competitiveness of energy sources (
This paper presents a model, in which a financially integrated system comprising several units of one technological type, rather than a single unit, is subject to an economic analysis. Issues involved in the calculation of the electricity cost in such systems and their construction have been considered. The study focuses on analyzing the possibilities for improving the commercial attractiveness of nuclear electricity generation in a tough market environment and for recruiting private investors for the nuclear energy sector. It has been shown that the calculation results obtained using the proposed model may differ markedly from the results of a calculation based on other models.
Levelized cost of a unit of product (
r = k×i/[q×(1 – exp{–iT})], (1)
where k is the sum the funds invested in the power unit construction and the interest on the investments by the start of the commercial unit operation; i is the discount rate; q is the annual electricity generation by the power unit; and T is the period for the return of the funds invested in the power unit construction.
Many papers on economics, including economics of nuclear power, connect the discount rate with the “value of money”, the so called weighted average cost of capital (WACC), for all sources of funding (
i = eD×iD + eE×iE,
where eD, eE are the shares of the shareholder liabilities and funds respectively (eD + eE = 1); and iD, iE are the interest on the loan capital (interest on the credit) and the stock capital (rate of return on shares).
If the operating costs u do not depend on time, then the calculated electricity unit cost с will be
c = r + u. (2)
As in (
Instead of a single power unit, the approach proposed in this paper considers a financially integrated electricity generating system comprising a number of power units owned by one company with integrated financial management. We shall call the results of the electricity cost calculation using this model the systemic cost of electricity. The competitiveness of alternative energy sources will be determined by comparing the systemic cost of the electricity they generate and the cost of the electricity produced by individual power units. The peculiarities of various tools used by investors for the power plant construction funding have been taken into account. Expression (1) for the calculation of the electricity cost component R for the replacement of capital in the event of a financially integrated system with different investment schemes takes the form
The capital letters in expression (3) denote the same quantities as the respective lower-case letters in (1) but for the system rather than for a single unit. The index f denotes the investors with a particular scheme for the construction funding and for the return of the invested funds. Expression (3) shows that the formula to calculate the electricity cost component R for the replacement of capital for a financially integrated system, taking into account the specific features of particular investors, has a more complex form, than formula (1), for the levelized cost calculation. For simplicity, the paper considers only two types of investors: f = 1 are shareholders, and f = 2 are external creditors (banks, funds, etc.).
It is highly important to consider the power unit construction funding by two or more investors with different loaning and payback conditions as the distribution of the investment flows for each of them may differ markedly, this affecting the cost calculation results (
Since the operating costs and the cost of the fuel in the system, as well as the annual electricity generation by the system, are proportional to the number of the units N, the operation cost components for the system will be the same as for a single power unit. Then the unit electricity cost for the system will be written as
c = R + u. (4)
The recovery profile for the NPP shareholder and creditor investments in the construction of one unit, after it starts to operate, for the case of the two funding sources mentioned above is a stepped function (Fig.
The time-dependent profiles for the return of investments to the NPP shareholders and creditors as applied to the thermal and nuclear power plant (TPP and NPP) units differ greatly. The investment return component is small, as compared with the operating and fuel costs, in technologies based on combustion of fossil fuel. So the difference in the amounts of the funds returned in the periods of the capital repayment to the shareholders and creditors is small against the background of the operating costs. In this case the estimated constant value of the levelized electricity cost differs insignificantly from the time-variable real stepped function and may be considered as a fairly acceptable estimate.
For nuclear units, the relative contribution of the investment cost repayment component to the unit cost of electricity is determining, so the difference in the amount of the funds returned in the periods of the capital repayment to the shareholders and the creditors and only to the shareholders is very great. The required amount of the funds to be returned in the period of the capital repayment to the shareholders and the creditors is much larger for nuclear power units than for units of the thermal power plants which means that the component of the investments return in the cost of electricity will also be much larger. In the financially integrated system this component can be partly reduced.
We shall assume that the introduced financially integrated energy generating system has reached a certain “asymptotic” state with the fixed capacity and it operates in a steady-state mode. The reactor unit decommissioned after its service life is over is replaced by a new unit on a timely basis. Thus the system is kept in a state with the constant number N of power units of one and the same type. The investment process connected with keeping the system in a steady power state is as follows (Fig.
The shareholders receive payments throughout the commercial operation period of each power unit. The construction of the unit “n + 1”, according to the adopted unit commissioning and decommissioning scheme, is credited such that the unit “n + 1” is commissioned by the time the debt for crediting the construction of the unit “n” has been repaid in full.
As it follows from Fig.
where k1 is the sum of the shareholder investments in the power unit construction; i1 is the rate for the shareholder dividends; q is the annual generation of electricity by one unit; and T1 is the time for the return of the shareholder investments in the power unit construction.
The situation is different for the electricity cost component connected with the return of the credited funds. In each credit repayment time interval TD, payments to the creditors are made only for the final of the system’s power units built (Fig.
where k2, i2,T2 are the parameters meeting the crediting conditions; and k = k1 + k2 is the total sum of the shareholder and creditor investments in the construction.
Substituting (5), (6) in (3), (4), we shall get the expression that determines the systemic electricity unit cost c in a fixed model of a financially integrated electricity generating system:
To obtain the minimum systemic electricity unit cost c, with N =1, one needs to optimize the shares of the funds invested in the power unit construction by the shareholders and by the creditors (k1 and k2 respectively) depending on the ratio of the return interest rate for the shareholders and the credit interest rate. With a higher rate of return (of the dividends) for the shareholders (15%), as compared with the credit interest rate (8%), the best ratio is 50% by 50% (
If the number of the reactors N in the system is large and the shareholder contribution to the project prevails (k1 >> k), then we arrive at the standard procedure for the calculation of the levelized electricity cost for one unit with one investing shareholder.
However, as it follows from (7), with the project funded jointly by shareholders and creditors, and with a sufficiently large number of units, the calculated unit cost of generated electricity may turn out to be smaller for a financially integrated system, as compared with the cost of the electricity generated by a system of units, not integrated economically. This is due to a reduction in the second component in formula (7) that determines the contribution of short-term crediting to the electricity cost. This may lead to a decrease in the unit cost of electricity.
The peculiarities involved in the calculation models of the electricity generation cost and the differences in the results obtained using these models are discussed in the context of light-water reactors (LWR) and combined-cycle plants (CCP).
The initial performance parameters of plants and the financial conditions of their construction are presented in Tables
In calculating the electricity generation cost, the plant lifetime costs are discounted separately with interest rates on the credit and the rate of return on shares. The rate of return for the owners (shareholders) of the enterprises using nuclear energy sources is higher than for the technology based on combustion of natural gas. This agrees with the data in (
Performance of nuclear and conventional plants (
LWR | CCP | ||
Installed power, MWel | 1000 | 500 | |
Thermal efficiency, % | 31 | 45 | |
Installed capacity utilization factor, % | 80 | 80 | |
Service life, years | 60 | 60 | |
Construction period, years | 5 | 2 | |
Unit capital costs, $/kW(el) | Low estimate | 2000 | 700 |
High estimate | 4000 | 900 | |
Investments per unit, $/kW(el) | Low estimate | 2500 | 770 |
High estimate | 5100 | 990 | |
Fuel cost, $/MW∙h | 5,5 | 40,0 | |
Operating costs, $/MW∙h | 7,0 | 10,0 | |
Number of units in system | 6 | 6 | |
Construction time and unit replacement frequency, years | 10 | 10 |
Financial conditions (
Unit type | Model | ||
Formula (1) with mean discount rate i | Systemic cost formula (7) | ||
Rate of return on shares, % | VVER | 15 | |
CCP | 12 | ||
Credit interest, % | 8 | ||
Mean discount rate, % | VVER | 11.5 | |
CCP | 10 | ||
Share of stock capital, % | 50 | 20 | |
Equity to debt ratio, % | 50 | 80 | |
Shareholder dividend payment period, years | 60 | 60 | |
Debt repayment period, years | 60 | 10 |
Fig.
As it follows from Fig.
Electricity cost for individual units and for a system (IU – investments per unit): a) – CCP: 1 – unit (IU 770 $/kWel); 2 – unit (IU 990 $/kWel); 3 – system (IU 770 $/kWel); 4 – system (IU 990 $/kWel); b) – LWR: 1 – unit (IU 2500 $/kWel); 2 – unit (IU 5100 $/kWel); 3 – system (IU 2500 $/kWel); 4 – system (IU 5100 $/kWel)
In this case, the electricity cost falls into a broad range of values depending on the models used and the amount of the unit capital costs. The levelized cost calculation results for one unit based on formula (1) with the mean discount rate i show that nuclear power remains competitive against CCPs with the LWR investments per unit being not more than 2500 $/kWel. With the investments per unit amounting to ~5000 $/kWel, the VVER electricity cost is however much higher than for CCPs, and NPPs cease to be competitive.
The transition to a financially integrated system makes it possible to increase greatly the competitiveness threshold of nuclear power. It can be seen from the comparison of diagrams in Figs
The above numerical example confirms that the competitiveness estimate at a systemic level may differ greatly from the estimate at a level of individual units. Primarily, this conclusion applies to capital-intensive technologies.
A financially integrated system is an entity that differs to a great extent, in economic terms, from individual units, and its construction seeks to search for the best funding schemes with regard for the peculiarities of the new entity in question so that to have a positive systemic effect in the shortest time possible.
The calculation results presented below are for the scenario of a financially integrated system built using the initial data given in Tables
As shown by the calculation results for the financially integrated system construction options, the key role in reducing the period for a low systemic electricity cost to be achieved is played by the financial conditions during the construction of the first unit in the system. Therefore, it was assumed in the scenario, the results of the electricity cost calculation for which are presented below, that a public or a large private energy company, when solving its strategic tasks, can grant certain benefits for the investment in the construction of the pilot unit in a financially integrated nuclear energy system.
The ratio of the authorized and debt capitals for the first unit was 50% by 50%, and it was assumed for keeping the electricity cost competitive for the initial ten years of the unit operation, as it is with (
The results of the calculation show (Fig.
With a larger number of units in the system, the systemic cost of electricity decreases further, as compared with the cost of the electricity generated by a single unit. As can be seen from Figs
The cost of the electricity generated by a financially integrated nuclear energy system may be lower than the cost of the electricity generated by individual units of the same type as in the system. The transition from the economy of individual units to the economy of integrated energy generating systems is expected to improve the commercial attractiveness of nuclear power, to bring its economic performance closer to the best performance indicators of fossil-fuel energy sources, and to contribute to expanding the public and private investments in nuclear power business.