Corresponding author: Ilnar I. Galiev ( iigaliev@rasu.ru ) Academic editor: Yury Korovin
© 2018 Ilnar I. Galiev, Alexey N. Chernyaev, Stanislav V. Bibik.
This is an open access article distributed under the terms of the Creative Commons Attribution License (CC BY 4.0), which permits unrestricted use, distribution, and reproduction in any medium, provided the original author and source are credited.
Citation:
Galiev II, Chernyaev AN, Bibik SV (2018) Development of seismic protection system for design extension conditions. Nuclear Energy and Technology 4(1): 43-50. https://doi.org/10.3897/nucet.4.29853
|
Development of seismic protection system for design extension conditions (SPS DEC) is suggested for enhancing safety of operation of NPP located on the territories with unfavorable seismic conditions. The idea of the system consists of the creation of a network of seismic stations arranged at a certain distance from the NPP and equipped with data transmission system. In case of detection by seismic sensors of movements of the ground with magnitude of vibrations exceeding a certain preset value, seismic stations transmit over radio-channel a signal indicating exceedance of the setting before the seismic wave reaches the NPP. This allows initiating transition of the reactor to subcritical operation mode prior to the beginning of destruction of equipment and reactor building. Ensuring reliable protected communication is achieved by simultaneous use of three radio-channels arranged in accordance with TETRA, WiMAx and LTE standards, as well as by the application of appropriate cryptography, authentication and data protection methods for preventing data corruption. Analysis was performed for determining optimal distance between seismic stations and the NPP and optimal number of these stations was determined for the following two options of arrangement of seismic stations: radial arrangement surrounding the NPP and arrangement along the direction towards the place with the highest probability of earthquake incipience. Layout was suggested of multilevel majoritarian data processing for excluding false triggering of the system. Conclusions were formulated on the enhancement of safety of NPP operation and significant reduction of probability of emergency situations due to the generation of anticipatory signals to reactor shutdown systems in case of earthquakes with intensity exceeding maximum design earthquake.
Seismic protection system, maximum design earthquake, reactor shutdown, seismic station, safety, VVER, data transmission.
Accident on the Fukushima-1 NPP in Japan and its consequences demonstrated the necessity of revision of classic methods for ensuring safety of nuclear power plants and their protection from destructive effects of seismic activity (
At present one of the directions of SPS development is the upgrading and expansion of networks of seismic stations (SS) for detection and registration of seismic impacts.
Seismic sensors installed on the basement plate of the reactor facility (RF) intended for continuous control of seismic impact on the NPP reactor facility and shaping discrete signal indicating the exceedance of the preset threshold of ground vibrations are included in the composition of SPS on the operated or constructed NPPs equipped with VVER reactor facilities. Seismic impacts in the form of earthquake shocks and vibrations of ground initiated both by natural causes and by artificial processes associated with human activities as well are examined. The natural causes may include tectonic, volcanic or landfall earthquakes, and explosions, filling water reservoirs or caving of mines refer to artificial causes.
As of today, equipment for NPPs under operation or construction equipped with VVER reactor facilities is selected in such a way as to ensure its operability in case of maximum design earthquake (MDE) which is determined by the specific geological conditions existing on the NPP site. In such case the possibility of earthquake with higher intensity is not considered. In other words, following the currently accepted paradigm of SPS implementation the possibility is examined of incipience of design earthquake (DE) and MDE referred to the events of the Design Basic Conditions (DBC) level, while the probability of initiation of beyond-design basis accident in case of more massive earthquakes (i.e. events of the Design Extension Conditions, DEC level) is disregarded.
In accordance with accepted norms the probability of initiation of MDE amounts to 104 1/year (
Theoretical substantiation of seismic protection system for design extension conditions (SPS DEC) representing the network of seismic stations installed at a certain distance from the NPP and equipped with the system for transmitting along the dedicated radio-channels the signal initiating power unit shutdown which is performed by introducing neutron absorbing rods in the reactor core is given in the present study. Triggering the system is anticipated in cases of incipience of earthquakes with intensities higher than that for MDE, i.e. in the conditions of initiation of events not identified by the design (DEC level).
The idea of creation of the network of remote seismic stations is exposed in (
Composition of the SPS DEC includes seismic sensors, modules for reception and processing of signals from seismic sensors at the seismic station, cable lines for transmitting signals from seismic sensors to seismic stations, device for transmission of radio-signals and module for signal reception and processing directly at the NPP.
Seismic sensors of the SPS DEC are installed radially at the distance of 5–10 m from seismic station at a certain depth underground in protected structures. Each seismic sensor includes three accelerometers for registration of seismic impacts and shaping discrete emergency signals warning about the exceedance of the preset level of seismic load and discrete signal indicating functionality of the sensor. In case of detection of movement of the ground with magnitude of vibrations in excess of a certain setting seismic stations transmit via radio-channels signal indicating the exceedance of the setting before the time moment when seismic wave reaches the NPP. This allows initiating conversion of reactor operation mode to subcritical state prior to the destruction of equipment and buildings. Shutting down of the power unit is implemented using technical means of the existing SPS.
Electricity supply of the seismic station is provided from external electric power supply grids or from solar panels and wind generators, as well as using batteries guaranteeing standalone operation of the system during 24 hours in case of disruption of external electricity supply.
For ensuring protection of the seismic station it is suggested to install the building of the seismic station on seismic protectors (
Communication between NPP and seismic stations must be protected, it must possess high reliability and exclude initiation of false triggering. Ensuring reliability, as well as protection against false triggering is achieved by parallel use of three radio-channels organized in accordance with TETRA (
Main technical characteristics of the applicable communication standards.
Communication standard | TETRA | WiMax | LTE |
Operating frequency | 150 – 900 MHz | 2 – 11 GHz | 1.4 – 20 GHz |
Range of action | Up to 60 km | Up to 50 km | Up to 100 km |
Data transmission rate | Up to 28 kbit/s | Up to 70 Mbit/s | Up to 100 Mbit/s |
Supplementary information | Data scrambling is achieved in the form of digital processing of low bit rate data stream which allows applying complex algorithms with high cryptographic immunity not impairing quality of recovered data | Expanded capability of operation beyond direct visibility | Optimal realization of required characteristics |
Exclusion of false triggering is achieved by application of multilevel majoritarian voting (Fig.
Protection of data transmitted through radio-channel is ensured using VPN technologies (
The main factor predetermining efficiency of the system is the higher rate of propagation of radio-waves as compared to seismic waves. The criterion of efficiency in such case is the event of transition of the reactor to subcritical operation mode before the moment when seismic wave reached the NPP site.
For reactor facilities of VVER type the design time for insertion of CPS rods in the reactor core amounts, as a rule, to not more than 4 s. Total time available for registration of the earthquake, processing and transmission of the data to NPP, reception and processing emergency signal directly at the NPP, was well as time for shaping control action and operation of mechanisms must be not more than 2 s. Thus, time margin tlim from the moment of registration of the earthquake (reception of signal of exceedance of the established threshold value of movement of the ground) until the moment when seismic wave reaches the NPP site must be not less than 6 s. In other words, removal of seismic stations and seismic sensors at longer distances away from the NPP must be such that the time needed for seismic wave for covering this distance will amount to not less than tlim = 6 s.
Intensity of earthquake I is the intensity of vibrations of the ground on the earth surface representing the destructive force of the earthquake. It depends on the magnitude (M), distance from the epicenter (S) and the depth of the earthquake source (H). Intensity of earthquake (in magnitude points) at the given point of the earth surface is determined by the following dependence (
where 3 and 1.5 are the regional constants (calculation was performed on the RF territory). Let us express M:
Taking into account that mean value of MDE intensity is equal to seven and minimum depth of occurrence of the epicenter H = 30 km, we plot dependence M (S) of earthquake magnitude on the distance between the NPP and the epicenter for which intensity of the earthquake on the NPP site is equal to seven points (Fig.
Conclusion can be drawn from analysis of the obtained dependence that in the case of incipience of earthquake with magnitude equal to 9.5 (theoretically maximum value of magnitude) at the distance of 850 km from the NPP site vibrations will occur on the site corresponding to intensity equal to seven points (postulated MDE).
Taking into account implementation of procedures for analyzing seismic threat during the selection of NPP construction site, subsequent analysis will be conducted by us taking into consideration incipience of the earthquake epicenter at the minimal distance of 100 km (
In the examination of 850-kilometer zone of possible incipience of earthquake and uniform distribution of epicenters probability of incipience of earthquake within the 100-kilometer zone is equal to
p = Sr=100/SR=850 = (pr2)/(pR2) = 1002/8502 = 0.014.
Mutual location of elements of the system, as well as distances between them are schematically shown in Fig.
Simplified layout of mutual arrangement of SPS elements and epicenter of the earthquake: O is the nuclear power plant; A, D, B … are the seismic stations; H is the epicenter of the earthquake, r = OA is the distance from the NPP to the seismic station; S = OH is the distance from NPP to the epicenter of the earthquake; AH is the distance from the epicenter to the seismic station.
T lim = tS – tAH = (S – AH)/V,
where tS is the time needed for seismic wave to reach the NPP site; tAH is the time needed for seismic wave to reach the seismic station; V is the seismic wave velocity.
Velocity of S-waves carrying the greatest energy of the earthquake equal to V » 3.4 km/s is taken to be the velocity of the seismic wave V. Taking into account that AH = (r2 + S2 – 2rScosa)1/2 and a = 360°/n, where n is the number of seismic stations (for the case of uniform arrangement), we obtain
T lim = [S – (r2 + S2 – 2rScos(360°/n))1/2]/V.
Solving quadratic equation we express r (n, S) from the above formula as follows:
r (n, S) = Scos(360°/n) + [2(S2cos(720°/n) + S2 – – 2V2tlim2 – 4SVtlim)]1/2/2.
Substituting the preset value of tlim = 6 s and V » 3.4 km/s we obtain the dependence between the distance r from the NPP to the seismic station, distance S from the NPP to the epicenter of the earthquake and the number of seismic stations n. Graphs of this dependence are plotted in Figure
Minimum distances from seismic station to the NPP are presented in Table
Required minimum distance from seismic stations to NPP for different numbers of seismic stations.
Number of seismic stations (n) | 5 | 6 | 7 | 8 | 9 | 10 | 12 |
Radius separating seismic station from NPP (r, km) | –* | –* | 47.3 | 34.1 | 29.6 | 27.2 | 24.7 |
The suggested solution can be varied depending on different input conditions of the design, customer’s requirements, geographical, geological and other conditions. For instance, the alternative method of arrangement of seismic stations is their arrangement along the direction of boundaries of lithospheric plates which is predetermined by higher probability of incipience of earthquake specifically within this area. Layout of such arrangement is represented in Fig.
Arrangement of seismic stations along the direction of boundaries of lithospheric plates: O – NPP; A, B, C … – seismic stations; H – epicenter of the earthquake; r = OC – distance from the NPP to the line along which the seismic stations are located; S = OH – distance from NPP to the epicenter of the earthquake; x = AC is the distance between seismic stations.
Let us determine the required distance r between the line along which seismic stations are arranged and the NPP, as well distance x between seismic stations ensuring fulfillment of the condition tlim3 6s. Taking into account that triggering the system is envisaged only upon reception of signals of exceedance of the setting from two seismic stations, calculation will be performed for the distance from the NPP to the seismic station equal to AH. Similar to the calculation for radial arrangement of seismic stations minimal distance from the epicenter to the NPP S=100 km will be accepted. Then, taking into account that AH = [x2 + (S – r)2] 1/2, we express the distance x (r):
x (r) = [(S – tlim×V)2 – (S – r)2]1/2.
Dependence x (r) is presented in Fig.
Comparative characteristics of the examined options of arrangement of seismic stations are given in Table
Comparative characteristics of the examined options of arrangement of seismic stations.
Type of arrangement | Radial | Along the direction towards the boundaries of lithospheric plates |
Required distance from the NPP, km | 34 | 24 |
Number of seismic stations | 8 | 3 |
Effective coverage of surface | 360° | Only along the direction towards potential location of the epicenter |
Option is suggested in the present paper of the seismic protection system for design extension conditions which, in case of incipience of earthquake with intensity larger than that for postulated MDE, i.e. in the conditions of potential development of design-basis accident, will allow performing timely activation of shutdown systems of power unit of the NPP before seismic wave reaches the NPP site, which will allow excluding the possibility of disastrous consequences.
The following two options of arrangement of seismic stations around the NPP are suggested: radial around the NPP and along the direction towards the place with the highest probability of incipience of earthquake. For fulfilling the efficiency criterion (tlim = 6 s) it is necessary to arrange 8 seismic stations around the NPP along the perimeter with radius equal to 34 km. In this case equipment of seismic stations can be installed in the premises of ARMCS posts located at approximately the same distance from the NPP.
In the second case installation of three seismic stations arranged along the line parallel to the boundary of lithospheric plates is sufficient for ensuring the preset time for generating preliminary warning signal. This line must be located at the distance equal to 24 km from the NPP with seismic stations arranged at the distance of 10 km from each other. This option of arrangement significantly reduces the number of constructed seismic stations but, however, NPP becomes in this case vulnerable to earthquakes with epicenter located along different directions.
It is evident that along with the above listed factors layout of arrangement of seismic stations relative to the NPP must be determined individually for each specific case on the basis of analysis of different originally stipulated specifications of the project, customer’s requirements, geographical, geological and other conditions.
SPS DEC is a flexible system allowing incorporating any number of seismic stations, different topologies and different options of organization of data transmission network. Application of meshed topology of the network differing from other types of architecture by enhanced reliability of communication is possible. Such reliability is achieved due to the fact that every network node is connected with several other nodes and, simultaneously, each of the nodes can take upon itself implementation of functions of commutator for other nodes. The layout of data transmission suggested in the present paper has the following advantages:
– Simultaneous use of three protected data transmission protocols allows ensuring the required degree of protection of the network from unauthorized access. Since in order it is necessary for the perpetrator to simultaneously intrude two protected data communication channels for each seismic station in order to shape false signal activating the system, which is physically impossible to achieve. Seismic stations are equipped with modern security alarm equipment including motion detection sensors.
– Application of majoritarian logic according to “two out of N” logic for shaping signal triggering reactor shutdown systems ensures protection from false triggering due to the local effects such as heavy objects falling in the vicinity of the seismic station, passage of heavy trucks, railroad cars, etc. Use of information from motion detection sensors as part of the algorithm of system operation allows as well to prevent false triggering of the systems in case of intentional local effects initiated by perpetrators within the zone of location of seismic stations.
– Application of majoritarian logic according to “two out of N” logic for input signals from seismic sensors and signals received from seismic stations through radio-channels ensures protection from false triggering initiated by individual failures of sensors and data transmission channels.
Potential individual failure in the data processing module and in the data transmission module on one of seismic stations will not disturb functioning of the SPS DEC. Seismic system transmits in real time signal to the NPP confirming operability of associated technical means. Alarm signaling failure of the seismic system is activated in the central control room of the NPP if the signal is lost. In such case maintenance personnel is promptly directed to the seismic station for eliminating causes of the failure. If, nevertheless, initiating events occur during this time period (i.e. earthquakes of appropriate force), they are registered by adjoining seismic stations ensuring implementation of functions of the SPS DEC within the time required for triggering preliminary alarm signal.
Installation of seismic stations on seismic protectors and laying cables to seismic stations inside flexible protected cable trays allow preserving functionality of the seismic station under loads exceeding loads developed during MDE. In case of break of electric power supply lines batteries installed on seismic stations guarantee standalone operation of the SPS DEC during the preset time period.
Based on the fact that functioning of the system under discussion is needed only in the conditions not anticipated by the NPP design and fraught with emergence of beyond-design basis accidents the system can be referred to the third safety class in pursuance with NP-001-15 (
Thus, conclusion can be drawn that the proposed seismic protection system is the viable option not requiring heavy expenses for its realization and allowing significantly enhancing safety of nuclear power plant due to timely signaling the beyond-design basis accidents initiated by earthquakes with intensities exceeding the MDE.