Diagram of the МАК-2 system with installed container units: 1 – upper target; 2 – lower target (90° rotated diagram).

 
 
  Part of: Zevyakin AS, Kolesov VV, Sobolev AV, Kochnov OY (2022) Possibility for using a low-enriched target to produce 99Mo in the MAK-2 research channel of the VVR-ts reactor. Nuclear Energy and Technology 8(2): 133-137. https://doi.org/10.3897/nucet.8.89351