Target assembly location (1/3rd core configuration).
Part of:
Amrani N, Boucenna A, Galahom AA (2022) Evaluation of transmutation rate of some LLFP in experimental fast reactor JOYO. Nuclear Energy and Technology 8(2): 91-96.
https://doi.org/10.3897/nucet.8.78428