MEPhI   National Research Nuclear University
Register | Login
Research Article
Nuclear Energy and Technology 7(2): 127-132
https://doi.org/10.3897/nucet.7.69175 (23 Jun 2021)
Other versions:
XML
PDF
cart
 
 
Twitter
Facebook
Mendeley
Reddit
Notify a colleague
  • ContentsContents
  • Article InfoArticle Info
  • CitationCitation
  • MetricsMetrics
  • CommentComment
  • RelatedRelated
  • FigsFigs
  • TabsTabs
  • RefsRefs
  • CitedCited
  • Article title
  • Abstract
  • Keywords
  • Introduction
  • ECW rate prediction model
  • Estimation of the ECW rate for components of pipelines with single- and two-phase media based on reinspection data (VVER-440 NPPs)
  • Time analysis of corrosion tester readings for VVER-440 NPPs
  • Time analysis of corrosion tester readings for RBMK-1000 NPPs
  • Conclusion
  • References
Powered by

This website uses cookies in order to improve your web experience. Read our Cookies Policy

OK