Service water supply system: 1 – turbine condenser; 2 – pumps РСС03 (2 pcs.); 3 – RAS circulating pumps (4 pcs.); 4 – РСС01 circulating pumps (2 pcs.); 5 – РСС04 pumps (2 pcs.); URA – cooling tower; URH – supply channel; URS – unit pumping station; UMA – turbine building (turbine hall).

 
 
  Part of: Povarov VP, Statsura DB, Usachev DYe (2020) Operating experience and ways to improve the performance of the service water supply system at the Novovoronezh NPP II (Units 1 and 2). Nuclear Energy and Technology 6(4): 253-260. https://doi.org/10.3897/nucet.6.60461