MEPhI   National Research Nuclear University
Register | Login
Research Article
Nuclear Energy and Technology 6(4): 253-260
https://doi.org/10.3897/nucet.6.60461 (20 Nov 2020)
Other versions:
XML
PDF
cart
 
 
Twitter
Facebook
Mendeley
Reddit
Notify a colleague
  • ContentsContents
  • Article InfoArticle Info
  • CitationCitation
  • MetricsMetrics
  • CommentComment
  • RelatedRelated
  • FigsFigs
  • RefsRefs
  • CitedCited
  • Article title
  • Abstract
  • Keywords
  • Introduction
  • Service water supply system operating modes
  • Opportunities for solving operation problems
    • 1. Mounting a crossover between the pressure pipelines of the nonessential services cooling water system of the turbine hall and the pressure pipelines of the cooling water system of the power unit auxiliary systems
    • 2. Installing an additional pump for the turbine building services cooling system
    • 3. Laying an additional pipeline to supply makeup water from the Don River to the water distribution channel of the unit pumping station
  • Conclusion
  • References
Powered by

This website uses cookies in order to improve your web experience. Read our Cookies Policy

OK