Nuclear Energy and Technology 6(3): 195-201
https://doi.org/10.3897/nucet.6.58969 (06 Nov 2020)
Other versions:
XML
PDF
cart
 
 
Twitter
Facebook
Mendeley
Reddit
Notify a colleague
  • ContentsContents
  • Article InfoArticle Info
  • CitationCitation
  • MetricsMetrics
  • CommentComment
  • RelatedRelated
  • FigsFigs
  • RefsRefs
  • CitedCited
  • Article title
  • Abstract
  • Keywords
  • Introduction
  • Characteristics of BiNCP’s buildings and structures
  • Organizational and technical arrangements at decommissioning stage
  • Key stages of the decommissioning process
    • Onsite dismantling of buildings and structures
    • Main building dismantling
    • ISG dismantling
    • Turbine compartment dismantling
    • Dismantling of the deaerator and control room compartment
    • Reactor compartment dismantling
    • Dismantling of the combined auxiliary building (CAB)
    • Dismantling of roofing, the building’s façade elements, and the main building columns
    • Filling of the main building and mound formation
  • Estimation of the shelter volumes
  • Conclusions and findings
  • References