Cause and effect diagram of the information model for the methodology to obtain the personnel reliability indicators based on the experience of long-term actual operation.

 
 
  Part of: Sobolev AV, Tutnov IA, Ukraintsev VF (2020) Assessment of the personnel reliability indicators during long-term operation of a nuclear power plant unit. Nuclear Energy and Technology 6(2): 83-88. https://doi.org/10.3897/nucet.6.54622