Variation of IRR with selling price of electricity considering low O&M costs-7.82$/MWh and fuel costs-4.50$/MWh, discount rate-10% and PCFs-75, 80, 85, and 90% (Case 1 to 4).
Part of: Shafiqul IMd, Bhuiyan TH (2020) Assessment of costs of nuclear power in Bangladesh. Nuclear Energy and Technology 6(3): 181-194. https://doi.org/10.3897/nucet.6.54003