Variation of NPV with selling price of electricity considering low O&M cost-7.82$/MWh and fuel cost-4.50$/MWh, discount rate-10%, and PCFs-75, 80, 85, and 90% (Case 1 to 4).

 
 
  Part of: Shafiqul IMd, Bhuiyan TH (2020) Assessment of costs of nuclear power in Bangladesh. Nuclear Energy and Technology 6(3): 181-194. https://doi.org/10.3897/nucet.6.54003