Comparison of LUEC of the three VVER-1200 Gen III+ NPP projects with two baseload power sources (IAEA/INPRO 2013, Paks II 2015).

 
 
  Part of: Shafiqul IMd, Bhuiyan TH (2020) Assessment of costs of nuclear power in Bangladesh. Nuclear Energy and Technology 6(3): 181-194. https://doi.org/10.3897/nucet.6.54003