MEPhI   National Research Nuclear University
Register | Login
Research Article
Nuclear Energy and Technology 6(3): 181-194
https://doi.org/10.3897/nucet.6.54003 (06 Nov 2020)
Other versions:
XML
PDF
cart
 
 
Twitter
Facebook
Mendeley
Reddit
Notify a colleague
  • ContentsContents
  • Article InfoArticle Info
  • CiteCite
  • MetricsMetrics
  • CommentComment
  • RelatedRelated
  • FigsFigs
  • TabsTabs
  • RefsRefs
  • CitedCited
  • Article title
  • Abstract
  • Keywords
  • 1. Introduction
  • 2. Literature review
  • 3. Economic and financial performances of NPPs
    • 3.1 Investment costs
    • 3.2 Operation & Maintenance (O&M) costs
    • 3.3 Fuel costs
    • 3.4 Decommissioning including waste management costs
    • 3.5 Levelized unit electricity cost (LUEC)
    • 3.6 Discount rate
    • 3.7 Plant capacity factor (PCF)
    • 3.8 Net present value (NPV)
    • 3.9 Internal rate of return (IRR)
    • 3.10 Payback period (PBP)
  • 4. Calculation tool and input data
    • 4.1 FINPLAN model
    • 4.2 Technical, economic, and financial data
  • 5. Results and discussion
    • 5.1 Case study 1 to 4
    • 5.2 Case study 5 to 8
    • 5.3 Case study-9: Worst scenario
    • 5.4 Comparison of LUECs with other power generating sources
    • 5.5 Payback period
    • 5.6 Cumulative loss/profit
  • 6. Conclusion
  • List of acronyms
  • Acknowledgement
  • References
Powered by

This website uses cookies in order to improve your web experience. Read our Cookies Policy

OK