Research Article
Other versions:
- ContentsContents
- Article InfoArticle Info
- CiteCite
- MetricsMetrics
- CommentComment
- RelatedRelated
- FigsFigs
- TabsTabs
- RefsRefs
- CitedCited
-
Article title
-
Abstract
-
Keywords
-
1. Introduction
-
2. Initial design solutions for NVNPP Units 3 and 4 (V-179)
-
3. The concept and implemented decisions on modernization of Units 3 and 4 to extend their service life up to 45 years
-
4. The concept and implemented decisions on re-modernization of NVNPP Unit 4 to extend their service life up to 60 years
-
5. The structure of the high pressure emergency core cooling system
-
6. The low pressure emergency core cooling system
-
7. The spray system and combined sealed compartments
-
8. Assessment of the main irreplaceable equipment life extension capability
-
9. Conclusion
-
References
Subscribe to email alerts for current Article's categories