MEPhI   National Research Nuclear University
Register | Login
Research Article
Nuclear Energy and Technology 5(3): 249-256
https://doi.org/10.3897/nucet.5.46380 (25 Sep 2019)
Other versions:
XML
PDF
cart
 
 
Twitter
Facebook
Mendeley
Reddit
Notify a colleague
  • ContentsContents
  • Article InfoArticle Info
  • CitationCitation
  • MetricsMetrics
  • CommentComment
  • RelatedRelated
  • FigsFigs
  • TabsTabs
  • RefsRefs
  • CitedCited
  • Article title
  • Abstract
  • Keywords
  • 1. Introduction
  • 2. Initial design solutions for NVNPP Units 3 and 4 (V-179)
  • 3. The concept and implemented decisions on modernization of Units 3 and 4 to extend their service life up to 45 years
  • 4. The concept and implemented decisions on re-modernization of NVNPP Unit 4 to extend their service life up to 60 years
  • 5. The structure of the high pressure emergency core cooling system
  • 6. The low pressure emergency core cooling system
  • 7. The spray system and combined sealed compartments
  • 8. Assessment of the main irreplaceable equipment life extension capability
  • 9. Conclusion
  • References
Powered by

This website uses cookies in order to improve your web experience. Read our Cookies Policy

OK