Forecast of the average number of failed flowmeters depending on the system operation time.
Part of: Pereguda AI (2019) Reliability of the RBMK-1000 coolant flow measurement system. Nuclear Energy and Technology 5(1): 81-87. https://doi.org/10.3897/nucet.5.34296