Map for the selected alternative fuel-reloading for the 18-month fuel cycle (67 fuel assemblies, 3200 MW)

 
 
  Part of: Hashlamoun TM, Vygovsky SB, Leskin ST, Duman AS (2019) Determination of 18-month fuel cycle parameters for the purpose of fuel costs minimization at the basis of use constructions of fuel assemblies in VVER-1200 reactors. Nuclear Energy and Technology 5(1): 9-15. https://doi.org/10.3897/nucet.5.33976