Laboratory facility: a) – overall view; b) – SG and TET arrangement in the LF
Part of: Dreganov OI, Shulimov VN, Kiseleva IV, Alekseev AV (2018) Measurement of the spent fuel rod cladding temperature during the in-pile testing at 500–900°C. Nuclear Energy and Technology 4(1): 21-26. https://doi.org/10.3897/nucet.4.29838