Research Article
Other versions:
- ContentsContents
- Article InfoArticle Info
- CiteCite
- MetricsMetrics
- CommentComment
- RelatedRelated
- FigsFigs
- TabsTabs
- RefsRefs
- CitedCited
-
Article title
-
Abstract
-
Keywords
-
Introduction
-
Power units with the BN-600 and BN-800 fast neutron reactors
-
Detailed design of the BN-800 power unit
-
Design peculiarities
-
Peculiarities of commissioning
-
First criticality of the Beloyarsk NPP’s unit 4
-
Achieving the minimum controlled power level (MCPL) with the minimum critical load
-
Startup core state
-
BN-800 first criticality results for the Beloyarsk NPP’s unit 4
-
Power startup of the Beloyarsk NPP’s unit 4
-
Trial startup of the K-800-130/3000 turbine
-
Generator synchronization and first grid connection
-
Pilot operation of the Beloyarsk NPP’s unit 4
-
Objectives of pilot operation
-
Pilot operation stages
-
Pilot operation results
-
-
Active commissioning
-
MOX fuel introduction in the BN-800 reactor
-
Conclusions
-
References
Subscribe to email alerts for current Article's categories