Design of the cask bottom with the sealing plug during drop tests with the cask dropped on a vertical bar from a height of 1 m: 1 – cask inner space; 2 – cask bottom; 3 – plug; 4 – bar; 5 – plug to cask bottom attachment; 6 – rubber O-rings.

 
 
  Part of: Gaiazov AZ, Gaiazov OZ, Kozlov VYu, Pavlov SV, Samsonov AA (2023) Calculation and experimental studies for the spent nuclear fuel shipping cask sealing assembly. Nuclear Energy and Technology 9(3): 183-187. https://doi.org/10.3897/nucet.9.113520